| Hearthstone’s crew hand carries
timbers on deck and sorts them for efficient assembly. |
First Timber Frame bent in the air
to be set by our crew. |
 |
 |
| Bent assembled and ready to be set. |
Center Bay standing. |
 |
 |
| Crew working late: sun up to sun
down. We don’t mess around. |
Front Porch Timbers sorted and ready
to assemble. |
 |
 |
| SIP Grooves ready for
spline and foam. |
 |
 |
| Structural Insulated Panel Wall—“all
insulation.” |
Foaming the SIP joints. |
 |
 |
| Valley rafter grooved to receive the
sheathing and pre-wire of timbers |
LVL to add support for “Timber
Trace” sub floor. |
 |
 |
| LVL Bolted to frame plus supported
by modified “Gun-Stock” post. |
“Gun-Stock” post |
 |
 |
| More “Gun-Stock” post and “pre-wire”
of timber. |
“Timber Trace” section |
 |
 |
| Foaming panel support members. |
Timber Frame gable wall with
interior finish Tongue and Groove installed. Roof panel on view side
of Timber Trace installed. |
 |
 |
| Shed dormer in the Timber Trace
section of the home. |
Notice massive 22” x 22” Timber
supporting ridge—all drilled, mortised and pegged.; |